General Disclaimers:
- The range has been determined on the basis of Directive (EU) No. 2017/1151. The range depends on the vehicle configuration.
- The charging time corresponds to a 10-80% full charge using a DC fast-charging station with a supply voltage of 400 V, minimum current 500 A.
- Figures for rated output and rated torque in accordance with Regulation (EC) No. 715/2007 as amended.
[1] Images may show additional items of special equipment.
[2] The marked components are digital extras. To use these digital extras, you must have a personal Mercedes me ID and also accept the Terms of Use for the digital extras. In addition, the vehicle must be paired with the corresponding user account. Upon expiry of the initial term, the digital extras can be renewed for a fee, provided they are still offered for the corresponding vehicle at that point. First-time activation of the digital extras is possible within 1 year of initial registration or operation by the customer, whichever comes first.
[3] Max. DC charging power
Maximum charging power at DC charging station with 400 volt supply, 300 A current; the maximum charging capacity depends on various factors, such as ambient and battery temperature and the state of charge of the battery when charging is started.
[4] In order to use the remote functions of the Mercedes Benz Wallbox and to receive over-the-air updates, the Mercedes me app, a personal Mercedes me ID and agreement to the terms of use for the digital extras are required. To receive the over-the-air updates, you must agree to the respective update in the Mercedes me app or give general consent in the Mercedes me app to receive all future updates.
[5] Not included in the delivery.
[6] 22 kW charging may require the appropriate special equipment "AC charging system (AC charging 22 kW)" depending on the manufacturer and vehicle. If this is not the case, the vehicle is automatically charged by the wallbox or the flexible charging system with the maximum possible charging power. The maximum charging power of the charging station must be adapted to the upstream installation (cable cross-section and protection).
[7] Our driver assistance and safety systems are merely aids, and do not relieve you of your responsibility as the driver. Please take note of the information in the owner's manual and the system limits which are described therein.